In 2026 from end of March for 3 months we will have a major inspection of a Steam Turbine (Alstom Design) at Emsland Lingen / Germany site.
We have estimated for the full scope the following manpower need :
Day Shift (6 / 10) 30.03. bis 20.06.26
in total ca. 6.700 working hours
1 Supervisor, 4-7 Turbine Fitters, 1 Rigger, 1 Crane Operator
Night Shift (6 / 10) 07.04. bis 02.05.26 und 29.05. bis 18.06.26
in total ca. 4.000 working hours
1 Supervisor, 5-7 Turbine Fitters, 1 Rigger, 1 Crane Operator
Supervisor • Mannheim, Baden-Wurttemberg, Germany